Planet Fitness - Carson Crossings

Criterions full scope package included framing, drywall, paint, dryfall, exterior performance coatings, ACT, FRP, and wallcovering in a single contract allowed for a simply sequenced project. Many challenges such as weather and owner supplied material required delicate planning, which were no challenge to the construction team. 

Twin Peaks

Friends In Service Helping was a state funded project for mixed-use, intended to provide opportunity for the misfortunate along with restaurants and offices. The budget of $900k included Drywall, Taping, Acoustic Ceilings, Wall protection, Exterior Plaster, and more. The project completion brought a positive change to the community.

Financial Horizons Credit Union

The credit unions full remodel was a full scope package for Criterion. The construction team performed demo, framing, drywall, paint, and specialty dimensional acoustic ceilings. All was performed while the bank remained in operation, which posed sound and dust challenges. The project was completed ahead of schedule, promoting one contractor for a majority of services.

Guthries

A ground up restaurant in Carson City with a full interior buildout package. Performing Criterions signature frame to finish package including FRP & ACT. We happily welcome a new business to Northern Nevada.

Oasis Academy

A classroom expansion required demo, ceiling modifications, frame and finish of new classroom walls and ceilings. The prevailing wage project required careful documentation which was no challenge for the team

St. Rose Medical Hospital

With a $700k contract value our executive team has managed Framing, Drywall, Taping, Acoustic Ceilings, and FRP. This east wing expansion was a project that doubled the size of the current hospital platform.

Ballys Tower

Our management team faced the challenge of a partial demo and a careful re-configuration of rooms with new metal stud walls, drywall, smooth finishes, doors, wallcoverings, and painted finish of the 756-room tower. With a $17 million scope budget, this project had a faster schedule than hotel towers on the Las Vegas strip due to its partial remodel—this type of schedule required two shifts and a high delivery expectation.

Madison Square Garden – The Sphere

The industry-leading dance, performance, and concert hall was a state-of-the-art project where the management team oversaw the cost management. The challenging project, in a cost-plus format, required attention to detail unlike any other. The execution of this was crucial to the expedited schedule of the 2023 F1 race in Las Vegas to showcase the project. Scopes included metal studs, drywall, ballistic protection, insulation, BIM/VDC, Pre-construction services, scaffolding, toilet partitions and accessories, and wall protection, which totaled more than $59 million.